Moderator: Tim White
Patrick Wilson wrote: Or to put it another way, is a section of PMI Pit Rope loaded with 230 lbs of caver & gear in Golondrinas at the bottom of the drop under any more "strain" than the same scenario in say Neversink?
Patrick Wilson wrote:Or to put it another way, is a section of PMI Pit Rope loaded with 230 lbs of caver & gear in Golondrinas at the bottom of the drop under any more "strain" than the same scenario in say Neversink?
GroundquestMSA wrote: A free hanging piece of PMI Pit 900,000 feet long would be in danger of breaking under it's own wieght, ... .
knudeNoggin wrote:GroundquestMSA wrote: A free hanging piece of PMI Pit 900,000 feet long would be in danger of breaking under it's own wieght, ... .
Just one of the reasons I prefer shorter lengths.
Btw, what would you hang it on?
Users browsing this forum: No registered users