here is the rig at surprise.
The left triangle is the one with the most directional stress. The back one didnt bother me as much but I go bakc I wont do this again. Jeff, I thought about this today at work and i think I would do nexst time what you said. Like at the Warm Up pit in ellisons, I would do a double 8 backed up by a butterfly knot. Rigging all the way back to the boulder 50' away was a hinder but we had 656' of rope to work with and it allowed me not to put all of that rope in the hole.
A friend of mine suggested this. Tie the long bunny ears, and adjust each line the length you need it and clove hitch the back side of it with a biner, just like a pull down rig. This would allow you to equalize the load on all 4 anchors without having a death triangle, but..........this would mean 8 biners to rig. Or tie a double 8, really long, then tie two 8's on each tail to each bolt, but that would be getting a bit riduclous. the bolts did look bomber, they were something like 5/8" diameter bolts or bigger.
It was a blast, the hike was a bit of a pain due to no SCCI trail markers........... if anyone goes and they want a waypoint route for gps let me know, as following the directions is kind of hard. I spent 10 minutes on the phone with the property manager on the hike up. Its just a transition from the road following the river, up the hill till you intersect a logging road that is the iffy part. AFter you hit the logging road its pretty easy.
Anyway, here is the picture.